Installation

Our company specializes in the fabrication and installation of equipment such as oil sludge tanks, brine tanks, and more. We excel in WINDBOX upgrade projects, reactor shell fabrication, isolation valve installation, and piping installation contracts. We provide sales, design, construction, and maintenance services for a wide range of industrial furnaces, kilns, equipment, pipelines, and refractory materials used in furnaces and corrosive environments. We are a trusted refractory solutions provider for major companies such as CPC and Formosa Plastics, boasting a wealth of experience and a strong track record in the industry.

Installation

Our company specializes in the fabrication and installation of equipment such as oil sludge tanks, brine tanks, and more. We excel in WINDBOX upgrade projects, reactor shell fabrication, isolation valve installation, and piping installation contracts.

We provide sales, design, construction, and maintenance services for a wide range of industrial furnaces, kilns, equipment, pipelines, and refractory materials used in furnaces and corrosive environments.

We are a trusted refractory solutions provider for major companies such as CPC and Formosa Plastics, boasting a wealth of experience and a strong track record in the industry.

Project Achievements

Fabrication and Installation of Post-Combustion Furnace Back-End Brine Tank Equipment for Waste Liquid
Fabrication of Reactor Shell
Waste Gas Incinerator Windbox Upgrade
YearOwnerProject
2022Taiwan _____WINDBOX Update Project
2021Plastics _____Refinery Furnace Inspection Reservation Project
2021South _____Equipment Fabrication and Installation for Post-Combustion Furnace Brine Tank
2021Taiwan _____ OilOil Sludge Tank Fabrication and Installation at Wastewater Treatment Plant
2021Taiwan _____Composite Powder Silo System Addition and Improvement Piping Project
2021Taiwan _____Expansion Turnkey Project – Non-Metallic Piping Project
2020Cooperation _____ ChemistryReactor Shell Fabrication Project
2019-2020Taiwan _____Waste Gas Incinerator Windbox Update Project
2019-2020Taiwan _____WINDBOX Update Project
2016-2018PlasticsDustproof Net Addition Project for Flushing Channel
2016South _____Preheating Equipment and System Update for Thermal Oil Boiler Exhaust Gas Treatment
2016South _____Exhaust Gas Treatment Equipment and System Update for Power Boiler Flue Gas Desulfurization (FGD) Absorption Tower
2012-2014Wan _____Above-Ground Pipe Prefabrication and Installation Project
2012-2014Wan _____Oil Connected Pipeline Project
2012-2014Wan _____Underground Oil Piping Project
2012China _____Oil Environmental and Combustion Equipment Improvement Piping Project
2012Plastics _____Ultra-Low NOx Combustor Equipment Installation Project
2012Taiwan _____ OilOil Instrument PIPE Pressure Guide Tube Installation and Pressure Testing Project
2012China _____Oil Pipe Rack Steam Tracing Piping Prefabrication and Installation Project
2012South _____Tower Tank Frame Stand Dismantling and Installation Project
2012South _____Tower Tank Frame Stand Dismantling and Installation Project
2012_____ ChemicalEquipment Update Project
2012_____ ChemicalEquipment Dismantling and Installation Project
2011-2012Wan _____Tower Tank Replacement and Installation Project